Search
Now showing items 1-1 of 1
Optimal pump scheduling with pressure control aspects: case studies
(CRC Press/Balkema, 2009-09-01)
In this paper a method for combined energy and pressure management via integration of pump scheduling with pressure control aspects is described and applied to a medium scale water supply network. The method is based on ...