Search
Now showing items 1-10 of 62
Modeling the dynamic response of conduits
(American Society of Heating, Refrigerating and Air-Conditioning Engineers Inc., 2002)
Operational scheduling requirements for multi-component flexible machining lines.
(Queens University, Belfast, 2002)
Improving the cost model development procedure.
(AACEI, 2002)
This paper describes current results and findings from an investigation whose principal aim is to improve the cost model development process, i.e. the speed and effectiveness with which cost models are developed and applied. ...
A framework for operational planning of multi-component flexible manpower lines.
(Queens University, Belfast, 2002)
Design and development of material and information flow for supply chaıns using genetic cellular networks.
(Dogus University, 2002)
In a recent paper by authors (Ziarati and Ucan, January 2001) a Back Propagation-Artificial Neural Network (BP-ANN) was adapted for predicting the required car parts quantities in a real and major auto parts supplier chain. ...